(1150) unloaded duplication system with repair and preventive maintenance نظام نسخ غير محمل مع الإصلاح والصيانة الوقائية

when we deal with the problem of finding the effect of combination of the preventive maintenance and repair to the lifetime of a two unit standby system. two policies for inspection have been considered. policy i, the operative unit undergoes inspection when the inspection time comes regardless of t...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autoři: nasr aldin, youseif, abdel hafez, adel
Médium: Other
Jazyk:other
Vydáno: the institute of national planning 2018
Témata:
On-line přístup:http://repository.inp.edu.eg/handle/123456789/4002
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!