(1493) The optimum production rate in "vehicle fleet scheduling" problems معدل الإنتاج الأمثل في مشاكل "جدولة أسطول المركبات"
The well known V.F.S problems became one of the classical problems under the assumption that the quantities which were found at the production pointSare fixed and do not depend on time. ' This paper aims at remodifying the problem in a more realistic and applicable mode by assuming that the qu...
Guardat en:
| Autor principal: | |
|---|---|
| Format: | Other |
| Idioma: | anglès |
| Publicat: |
The Institute of National Planning
2018
|
| Matèries: | |
| Accés en línia: | http://repository.inp.edu.eg/handle/123456789/4126 |
| Etiquetes: |
Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!
|
| _version_ | 1869359359548456960 |
|---|---|
| author | Abdel Rahman, Mohammed Yehia |
| author_facet | Abdel Rahman, Mohammed Yehia |
| author_sort | Abdel Rahman, Mohammed Yehia |
| collection | DSpace |
| description | The well known V.F.S problems became one of the classical problems under the assumption that the quantities which were found at the production pointSare fixed and do not depend on time. ' This paper aims at remodifying the problem in a more realistic and applicable mode by assuming that the quantities will increase in a given rate. |
| format | Other |
| id | ir-123456789-4126 |
| institution | My University |
| language | English |
| publishDate | 2018 |
| publisher | The Institute of National Planning |
| record_format | dspace |
| spelling | ir-123456789-41262026-03-03T09:28:47Z (1493) The optimum production rate in "vehicle fleet scheduling" problems معدل الإنتاج الأمثل في مشاكل "جدولة أسطول المركبات" Abdel Rahman, Mohammed Yehia Production Vehicle Fleet The well known V.F.S problems became one of the classical problems under the assumption that the quantities which were found at the production pointSare fixed and do not depend on time. ' This paper aims at remodifying the problem in a more realistic and applicable mode by assuming that the quantities will increase in a given rate. 2018-08-14T08:27:34Z 2018-08-14T08:27:34Z 1989-01 Other http://repository.inp.edu.eg/handle/123456789/4126 en External notes;1493 application/pdf The Institute of National Planning |
| spellingShingle | Production Vehicle Fleet Abdel Rahman, Mohammed Yehia (1493) The optimum production rate in "vehicle fleet scheduling" problems معدل الإنتاج الأمثل في مشاكل "جدولة أسطول المركبات" |
| title | (1493) The optimum production rate in "vehicle fleet scheduling" problems
معدل الإنتاج الأمثل في مشاكل "جدولة أسطول المركبات" |
| title_full | (1493) The optimum production rate in "vehicle fleet scheduling" problems
معدل الإنتاج الأمثل في مشاكل "جدولة أسطول المركبات" |
| title_fullStr | (1493) The optimum production rate in "vehicle fleet scheduling" problems
معدل الإنتاج الأمثل في مشاكل "جدولة أسطول المركبات" |
| title_full_unstemmed | (1493) The optimum production rate in "vehicle fleet scheduling" problems
معدل الإنتاج الأمثل في مشاكل "جدولة أسطول المركبات" |
| title_short | (1493) The optimum production rate in "vehicle fleet scheduling" problems
معدل الإنتاج الأمثل في مشاكل "جدولة أسطول المركبات" |
| title_sort | 1493 the optimum production rate in vehicle fleet scheduling problems معدل الإنتاج الأمثل في مشاكل جدولة أسطول المركبات |
| topic | Production Vehicle Fleet |
| url | http://repository.inp.edu.eg/handle/123456789/4126 |
| work_keys_str_mv | AT abdelrahmanmohammedyehia 1493theoptimumproductionrateinvehiclefleetschedulingproblemsmʿdlạlạntạjạlạmtẖlfymsẖạkljdwlẗạsṭwlạlmrkbạt |