(1493) The optimum production rate in "vehicle fleet scheduling" problems معدل الإنتاج الأمثل في مشاكل "جدولة أسطول المركبات"
The well known V.F.S problems became one of the classical problems under the assumption that the quantities which were found at the production pointSare fixed and do not depend on time. ' This paper aims at remodifying the problem in a more realistic and applicable mode by assuming that the qu...
Bewaard in:
| Hoofdauteur: | |
|---|---|
| Formaat: | Other |
| Taal: | Engels |
| Gepubliceerd in: |
The Institute of National Planning
2018
|
| Onderwerpen: | |
| Online toegang: | http://repository.inp.edu.eg/handle/123456789/4126 |
| Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|