(564) Program Evaluation and Review Technique (PERT) With Computer Application II. PERT/COST تقنية تقييم ومراجعة البرامج مع تطبيقات الحاسوب الجزء الثانى

In the previous memo. (PERT/TIME), the PERT method was introduced and it was shown how the critical path method (CPM) could be used in preparing the time schedule of the project, in pinpointing the areas in the project that needs special attention, and in determining the man-power and equipment nece...

Descrizione completa

Salvato in:
Dettagli Bibliografici
Autori principali: Taha, Hamdy, Mongy, Mohamed A.
Natura: Libro
Pubblicazione: معهد التخطيط القومى 2024
Soggetti:
Accesso online:http://repository.inp.edu.eg//handle/123456789/5604
Tags: Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!

Documenti analoghi