(564) Program Evaluation and Review Technique (PERT) With Computer Application II. PERT/COST تقنية تقييم ومراجعة البرامج مع تطبيقات الحاسوب الجزء الثانى

In the previous memo. (PERT/TIME), the PERT method was introduced and it was shown how the critical path method (CPM) could be used in preparing the time schedule of the project, in pinpointing the areas in the project that needs special attention, and in determining the man-power and equipment nece...

Fuld beskrivelse

Saved in:
Bibliografiske detaljer
Main Authors: Taha, Hamdy, Mongy, Mohamed A.
Format: Bog
Udgivet: معهد التخطيط القومى 2024
Fag:
Online adgang:http://repository.inp.edu.eg//handle/123456789/5604
Tags: Tilføj Tag
Ingen Tags, Vær først til at tagge denne postø!