(564) Program Evaluation and Review Technique (PERT) With Computer Application II. PERT/COST تقنية تقييم ومراجعة البرامج مع تطبيقات الحاسوب الجزء الثانى

In the previous memo. (PERT/TIME), the PERT method was introduced and it was shown how the critical path method (CPM) could be used in preparing the time schedule of the project, in pinpointing the areas in the project that needs special attention, and in determining the man-power and equipment nece...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Main Authors: Taha, Hamdy, Mongy, Mohamed A.
Formato: Livro
Publicado em: معهد التخطيط القومى 2024
Assuntos:
Acesso em linha:http://repository.inp.edu.eg//handle/123456789/5604
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!