(828) On The Critical Path Method (C.P.M) and its Application in the G.D.R عن طريقة المسار الحرج (C.P.M) وتطبيقها في جمهورية ألمانيا الديمقراطية
Network models and methods are primarily used for flow and time planning of complex processes. Decision-making relies on sequencing problems, as these processes involve the simultaneous or successive flow of partial processes. It is essential to examine the optimal temporal arrangements of interdepe...
| Autore principale: | |
|---|---|
| Natura: | Libro |
| Lingua: | inglese |
| Pubblicazione: |
The Institute of National Planning
2024
|
| Soggetti: | |
| Accesso online: | http://repository.inp.edu.eg//handle/123456789/5868 |
| Tags: |
Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
|
| Riassunto: | Network models and methods are primarily used for flow and time planning of complex processes. Decision-making relies on sequencing problems, as these processes involve the simultaneous or successive flow of partial processes. It is essential to examine the optimal temporal arrangements of interdependent processes. The goal is to determine the total process duration and finishing dates while exploring possibilities to shorten the duration through better coordination of partial processes. Additionally, it is necessary to establish whether the quantities are deterministic or stochastic, which necessitates the use of different methods in network techniques. When deterministic quantities are present, a deterministic model and C.P.M. method or similar approaches can be utilized. |
|---|