MODEL I. INVESTMENT REQUIREMENTS UNDER A GIVEN TIME SHAPE OF CURRENT FINAL DEMAND./ / النموذج الأول. متطلبات الاستثمار في فترة زمنية معينة: شكل الطلب النهائي الحالي
This study discusses a model of total domestic production (denoted as X) across various sectors of the economy over a time horizon defined by a plan with a fixed duration. The plan spans a number of years, with the origin of the time scale being the year t = 0 when the plan is decided. The study foc...
| Autor principal: | |
|---|---|
| Formato: | Other |
| Idioma: | inglês |
| Publicado em: |
The Institute Of National Planning.
2018
|
| Assuntos: | |
| Acesso em linha: | http://repository.inp.edu.eg/xmlui/handle/123456789/3847 |
| Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|
| Resumo: | This study discusses a model of total domestic production (denoted as X) across various sectors of the economy over a time horizon defined by a plan with a fixed duration. The plan spans a number of years, with the origin of the time scale being the year t = 0 when the plan is decided. The study focuses on a fixed set of input coefficients for current account operations between different sectors of domestic production. Specifically, the input coefficient from sector h to sector k in year t determines the amount of input required. The assumption is that there are no substitution possibilities among inputs from different sectors. The model considers the execution of the plan over T years (e.g., T=5 years), and n sectors are involved. The approach assumes fixed, scale-independent input coefficients.. |
|---|