MODEL I. INVESTMENT REQUIREMENTS UNDER A GIVEN TIME SHAPE OF CURRENT FINAL DEMAND./ / النموذج الأول. متطلبات الاستثمار في فترة زمنية معينة: شكل الطلب النهائي الحالي

This study discusses a model of total domestic production (denoted as X) across various sectors of the economy over a time horizon defined by a plan with a fixed duration. The plan spans a number of years, with the origin of the time scale being the year t = 0 when the plan is decided. The study foc...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Autor principal: Frisch, Ragnar.
Formato: Other
Idioma:inglês
Publicado em: The Institute Of National Planning. 2018
Assuntos:
Acesso em linha:http://repository.inp.edu.eg/xmlui/handle/123456789/3847
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
Descrição
Resumo:This study discusses a model of total domestic production (denoted as X) across various sectors of the economy over a time horizon defined by a plan with a fixed duration. The plan spans a number of years, with the origin of the time scale being the year t = 0 when the plan is decided. The study focuses on a fixed set of input coefficients for current account operations between different sectors of domestic production. Specifically, the input coefficient from sector h to sector k in year t determines the amount of input required. The assumption is that there are no substitution possibilities among inputs from different sectors. The model considers the execution of the plan over T years (e.g., T=5 years), and n sectors are involved. The approach assumes fixed, scale-independent input coefficients..