Program Evaluation and Review Technique (PERT) With Computer Application II. PERT/COST/ تقنية تقييم ومراجعة البرامج مع تطبيقات الحاسوب الجزء الثانى

In the previous memo. (PERT/TIME), the PERT method was introduced and it was shown how the critical path method (CPM) could be used in preparing the time schedule of the project, in pinpointing the areas in the project that needs special attention, and in determining the man-power and equipment nece...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autores principales: Taha, Hamdy, Mongy, Mohamed A.
Formato: Libro
Publicado: معهد التخطيط القومى 2024
Materias:
Acceso en línea:http://repository.inp.edu.eg//handle/123456789/5604
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!