Program Evaluation and Review Technique (PERT) With Computer Application II. PERT/COST/ تقنية تقييم ومراجعة البرامج مع تطبيقات الحاسوب الجزء الثانى
In the previous memo. (PERT/TIME), the PERT method was introduced and it was shown how the critical path method (CPM) could be used in preparing the time schedule of the project, in pinpointing the areas in the project that needs special attention, and in determining the man-power and equipment nece...
| Үндсэн зохиолчид: | , |
|---|---|
| Формат: | Ном |
| Хэвлэсэн: |
معهد التخطيط القومى
2024
|
| Нөхцлүүд: | |
| Онлайн хандалт: | http://repository.inp.edu.eg//handle/123456789/5604 |
| Шошгууд: |
Шошго нэмэх
Шошго байхгүй, Энэхүү баримтыг шошголох эхний хүн болох!
|