Program Evaluation and Review Technique (PERT) With Computer Application II. PERT/COST/ تقنية تقييم ومراجعة البرامج مع تطبيقات الحاسوب الجزء الثانى

In the previous memo. (PERT/TIME), the PERT method was introduced and it was shown how the critical path method (CPM) could be used in preparing the time schedule of the project, in pinpointing the areas in the project that needs special attention, and in determining the man-power and equipment nece...

Descripció completa

Guardat en:
Dades bibliogràfiques
Autors principals: Taha, Hamdy, Mongy, Mohamed A.
Format: Llibre
Publicat: معهد التخطيط القومى 2024
Matèries:
Accés en línia:http://repository.inp.edu.eg//handle/123456789/5604
Etiquetes: Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!