On The Planning Method "PERT" and its Application in the GDR/عن طريقة التخطيط "PERT" وتطبيقها في جمهورية ألمانيا الديمقراطية

Stochastic models of network techniques are based on a network that illustrates the flow of the overall process and its partial processes. This network is prepared similarly to the critical path method. However, there are some differences in time planning. The PERT (Program Evaluation and Review...

Szczegółowa specyfikacja

Zapisane w:
Opis bibliograficzny
1. autor: Goettner, Reinhard
Format: Książka
Język:angielski
Wydane: The Institute of National Planning 2024
Hasła przedmiotowe:
Dostęp online:http://repository.inp.edu.eg//handle/123456789/5867
Etykiety: Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!
_version_ 1853147127431036928
author Goettner, Reinhard
author_facet Goettner, Reinhard
author_sort Goettner, Reinhard
collection DSpace
description Stochastic models of network techniques are based on a network that illustrates the flow of the overall process and its partial processes. This network is prepared similarly to the critical path method. However, there are some differences in time planning. The PERT (Program Evaluation and Review Technique) method is based on a stochastic model. The various quantities used are not unambiguously determined as in the critical path method; instead, activity times, event dates (except for the project's start), and the overall duration time reflected in the network are interpreted stochastically. It is assumed that activity time cannot only be represented as a time value but as a probability distribution. This results in the impossibility of determining dates unambiguously; for example, one cannot say that the finish date of an activity will be on July 15th. Instead, it can only be stated that the finish date is expected with a certain percentage of probability within a time range. If the network is prepared for a project to be treated according to PERT, it is possible to begin time planning on this basis. Its primary task is to investigate the total time required for realizing the entire project, based on time estimates for each activity. These estimates must be made by a specialist capable of evaluating the corresponding partial process as accurately as possible. تستند النماذج العشوائية لتقنيات الشبكات إلى شبكة توضح تدفق العملية الكلية وعملياتها الجزئية. يتم إعداد هذه الشبكة بنفس الطريقة التي تم مناقشتها عند معالجة طريقة المسار الحرج. ومع ذلك، توجد بعض الاختلافات في تخطيط الزمن. تستند طريقة "PERT" (تقنية تقييم ومراجعة البرنامج) إلى نموذج عشوائي. الكميات المستخدمة ليست محددة بشكل واضح كما هو الحال في المسار الحرج، بل يتم تفسير أوقات الأنشطة، وتواريخ الأحداث (باستثناء بداية المشروع الكلي)، ومدة العملية الكاملة بشكل عشوائي. يتم افتراض أن وقت النشاط لا يمكن تمثيله فقط كقيمة زمنية، بل كتوزيع احتمالي. هذا يؤدي إلى عدم إمكانية تحديد التواريخ بشكل واضح، حيث لا يمكن القول إن تاريخ انتهاء النشاط سيكون في 15 يوليو، بل يمكن فقط القول إن تاريخ الانتهاء متوقع بنسبة معينة من الاحتمالية في الفترة من... إلى... إذا تم إعداد الشبكة لمشروع سيتم معالجته وفقًا لطريقة PERT، فمن الممكن البدء بتخطيط الزمن على هذا الأساس. تتمثل مهمتها الأساسية في التحقيق في إجمالي الوقت اللازم لتنفيذ المشروع الكلي، استنادًا إلى تقديرات زمنية لكل نشاط. يجب أن يتم إجراء التقديرات بواسطة متخصص قادر على تقييم العملية الجزئية ذات الصلة بأفضل شكل ممكن.
format Book
id oai:repository.inp.ed.eg:123456789-5867
institution My University
language English
publishDate 2024
publisher The Institute of National Planning
record_format dspace
spelling oai:repository.inp.ed.eg:123456789-58672024-12-30T08:26:14Z On The Planning Method "PERT" and its Application in the GDR/عن طريقة التخطيط "PERT" وتطبيقها في جمهورية ألمانيا الديمقراطية Goettner, Reinhard Program Evaluation and Review Technique Stochastic models Stochastic models of network techniques are based on a network that illustrates the flow of the overall process and its partial processes. This network is prepared similarly to the critical path method. However, there are some differences in time planning. The PERT (Program Evaluation and Review Technique) method is based on a stochastic model. The various quantities used are not unambiguously determined as in the critical path method; instead, activity times, event dates (except for the project's start), and the overall duration time reflected in the network are interpreted stochastically. It is assumed that activity time cannot only be represented as a time value but as a probability distribution. This results in the impossibility of determining dates unambiguously; for example, one cannot say that the finish date of an activity will be on July 15th. Instead, it can only be stated that the finish date is expected with a certain percentage of probability within a time range. If the network is prepared for a project to be treated according to PERT, it is possible to begin time planning on this basis. Its primary task is to investigate the total time required for realizing the entire project, based on time estimates for each activity. These estimates must be made by a specialist capable of evaluating the corresponding partial process as accurately as possible. تستند النماذج العشوائية لتقنيات الشبكات إلى شبكة توضح تدفق العملية الكلية وعملياتها الجزئية. يتم إعداد هذه الشبكة بنفس الطريقة التي تم مناقشتها عند معالجة طريقة المسار الحرج. ومع ذلك، توجد بعض الاختلافات في تخطيط الزمن. تستند طريقة "PERT" (تقنية تقييم ومراجعة البرنامج) إلى نموذج عشوائي. الكميات المستخدمة ليست محددة بشكل واضح كما هو الحال في المسار الحرج، بل يتم تفسير أوقات الأنشطة، وتواريخ الأحداث (باستثناء بداية المشروع الكلي)، ومدة العملية الكاملة بشكل عشوائي. يتم افتراض أن وقت النشاط لا يمكن تمثيله فقط كقيمة زمنية، بل كتوزيع احتمالي. هذا يؤدي إلى عدم إمكانية تحديد التواريخ بشكل واضح، حيث لا يمكن القول إن تاريخ انتهاء النشاط سيكون في 15 يوليو، بل يمكن فقط القول إن تاريخ الانتهاء متوقع بنسبة معينة من الاحتمالية في الفترة من... إلى... إذا تم إعداد الشبكة لمشروع سيتم معالجته وفقًا لطريقة PERT، فمن الممكن البدء بتخطيط الزمن على هذا الأساس. تتمثل مهمتها الأساسية في التحقيق في إجمالي الوقت اللازم لتنفيذ المشروع الكلي، استنادًا إلى تقديرات زمنية لكل نشاط. يجب أن يتم إجراء التقديرات بواسطة متخصص قادر على تقييم العملية الجزئية ذات الصلة بأفضل شكل ممكن. 2024-12-30T08:26:06Z 2024-12-30T08:26:06Z 1968-03-01 Book cairo http://repository.inp.edu.eg//handle/123456789/5867 en سلسلة مذكرات خارجية;829 application/pdf The Institute of National Planning
spellingShingle Program Evaluation and Review Technique
Stochastic models
Goettner, Reinhard
On The Planning Method "PERT" and its Application in the GDR/عن طريقة التخطيط "PERT" وتطبيقها في جمهورية ألمانيا الديمقراطية
title On The Planning Method "PERT" and its Application in the GDR/عن طريقة التخطيط "PERT" وتطبيقها في جمهورية ألمانيا الديمقراطية
title_full On The Planning Method "PERT" and its Application in the GDR/عن طريقة التخطيط "PERT" وتطبيقها في جمهورية ألمانيا الديمقراطية
title_fullStr On The Planning Method "PERT" and its Application in the GDR/عن طريقة التخطيط "PERT" وتطبيقها في جمهورية ألمانيا الديمقراطية
title_full_unstemmed On The Planning Method "PERT" and its Application in the GDR/عن طريقة التخطيط "PERT" وتطبيقها في جمهورية ألمانيا الديمقراطية
title_short On The Planning Method "PERT" and its Application in the GDR/عن طريقة التخطيط "PERT" وتطبيقها في جمهورية ألمانيا الديمقراطية
title_sort on the planning method pert and its application in the gdr عن طريقة التخطيط pert وتطبيقها في جمهورية ألمانيا الديمقراطية
topic Program Evaluation and Review Technique
Stochastic models
url http://repository.inp.edu.eg//handle/123456789/5867
work_keys_str_mv AT goettnerreinhard ontheplanningmethodpertanditsapplicationinthegdrʿnṭryqẗạltkẖṭyṭpertwtṭbyqhạfyjmhwryẗạlmạnyạạldymqrạṭyẗ