Ngā hua rapu - critical path (method OR methods).

  • E whakaatu ana i te 1 - 7 hua o te 7
Whakamahine hua
  1. 1

    On The Critical Path Method (C.P.M) and its Application in the G.D.R. / Gottner, Habil Reinhard

    I whakaputaina 1968
    Ngā marau: “…Critical Path Method.…”
    Pukapuka
  2. 2
  3. 3
  4. 4

    (564) Program Evaluation and Review Technique (PERT) With Computer Application II. PERT/COST تقنية تقييم ومراجعة البرامج مع تطبيقات الحاسوب الجزء الثانى... Taha, Hamdy, Mongy, Mohamed A.

    I whakaputaina 2024
    “…(PERT/TIME), the PERT method was introduced and it was shown how the critical path method (CPM) could be used in preparing the time schedule of the project, in pinpointing the areas in the project that needs special attention, and in determining the man-power and equipment necessary to execute the plan. …”
    Whiwhi kuputuhi katoa
    Pukapuka
  5. 5

    (812) The Application of Network Techniques in Planning and Management تطبيق تقنيات الشبكات في التخطيط والإدارة Karl-Heinz Horn

    I whakaputaina 2024
    “…The Study discusses the Critical Path Method (CPM) and the Program Evaluation and Review Technique (PERT), which are two modern mathematical planning methods. …”
    Whiwhi kuputuhi katoa
  6. 6

    مذكرات معهد التخطيط القومي : 826 - 848 /

    Pukapuka
  7. 7

    (611) بحث تخطيط القوى العاملة على المدى الطويل صليب روفائيل

    I whakaputaina 2026
    “…This allows for the identification of critical paths and the economical allocation of manpower—technicians, mechanics, and sailors—ensuring tasks are completed in the shortest possible time and with minimal resource consumption . …”
    Whiwhi kuputuhi katoa
    Pukapuka