The optimum production rate in "vehicle fleet scheduling" problems
The well known V.F.S problems became one of the classical problems under the assumption that the quantities which were found at the production pointSare fixed and do not depend on time. ' This paper aims at remodifying the problem in a more realistic and applicable mode by assuming that the qu...
Sábháilte in:
| Príomhchruthaitheoir: | |
|---|---|
| Formáid: | Other |
| Teanga: | Béarla |
| Foilsithe / Cruthaithe: |
The Institute of National Planning
2018
|
| Ábhair: | |
| Rochtain ar líne: | http://repository.inp.edu.eg/xmlui/handle/123456789/4126 |
| Clibeanna: |
Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|